Release Date
25 Apr, 1978
Runtime
01:09: (HH:MM)
Synopsis
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
Original Title
Yje mbi Drin
Photos
Release Date
25 Apr, 1978
Runtime
01:09: (HH:MM)
Synopsis
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
Original Title
Yje mbi Drin
Photos